Isolation Facilities at Stud Farm

isolation-main.jpg
isolation-1.jpg

KWA designed and secured planning permission for replacement Isolation facilities at a top stud farm in Newmarket.

The scheme included eight Isolation boxes along with a tack/feed store.

The existing isolation facilities were dilapidated and in need of replacement. KWA worked with the client and Council to deliver quality replacement timber Isolation facilities to meet the Stud’s needs and protect the stock from the spread of infection. The site was constrained by an overhead wire so KWA worked with the relevant authorities to relocate the cable underground to allow the development to proceed.